Suçati
Download PDF data sheet
Suçati completed

Particulars
Owner: unknown
Designer: EN-SU Engineering
Contractor: ERE Engineering Co.
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 9 m3x106
Height: 36 metres
Length: 192 metres
Volume of RCC: 55 m3x103
Total volume: 60 m3x103
Construction Dates
Start of Project: 01/98 (January 1998)
Start of RCC: 02/99 (February 1999)
End of RCC: 10/99 (October 1999)
End of Project: 10/99 (October 1999)
Country: Turkey
River: Güredin Creek
DMS Co-ordinates: 37˚45'40.59"N, 36˚43'58.97"E
DD Co-ordinates: 37.761276, 36.733047
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Ground-granulated blast-furnace slag |