SEARCHING
... please wait

Suçati

Download PDF data sheet
Suçati completed
Suçati completed

Particulars

Owner: unknown

Designer: EN-SU Engineering

Contractor: ERE Engineering Co.

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 9 m3x106

Height: 36 metres

Length: 192 metres

Volume of RCC: 55 m3x103

Total volume: 60 m3x103

Construction Dates

Start of Project: 01/98 (January 1998)

Start of RCC: 02/99 (February 1999)

End of RCC: 10/99 (October 1999)

End of Project: 10/99 (October 1999)

Country: Turkey

River: Güredin Creek

DMS Co-ordinates: 37˚45'40.59"N, 36˚43'58.97"E

DD Co-ordinates: 37.761276, 36.733047

Facings

Upstream

SlopeType
VerticalRCC against precast concrete panels

Downstream

SlopeType
0.80RCC against precast concrete panels

Spillway

SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
50
Pozzolan (kg/m3)Pozzolan Type
100Ground-granulated blast-furnace slag