Taishir
Download PDF data sheet
Particulars
Owner: unknown
Designer: AMEC-SMEC Joint Venture
Contractor: SinoHydro Co. Ltd.
Statistics
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
Reservoir capacity: 930 m3x106
Height: 60 metres
Length: 200 metres
Volume of RCC: 210 m3x103
Total volume: 250 m3x103
Construction Dates
Start of Project: 02/05 (February 2005)
Start of RCC: 05/06 (May 2006)
End of RCC: 06/07 (June 2007)
End of Project: 12/07 (December 2007)
Country: Mongolia
River: Zabkhan
DMS Co-ordinates: 46˚41'39.14"N, 96˚39'56.75"E
DD Co-ordinates: 46.694206, 96.665764
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork with external geomembrane |
Downstream
Slope | Type |
---|---|
0.72 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.72 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
333 | 333 |
Cementitious material
Cement (kg/m3) |
---|
75 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |