Taquarembó
Download PDF data sheet
Taquarembó under construction

Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Water Supply
Reservoir capacity: unknown
Height: 33 metres
Length: 330 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: 05/08 (May 2008)
Start of RCC: —/10 (— 2010)
End of RCC: —/19 (— 2019)
End of Project: —/20 (— 2020)
Country: Brazil
River: Taquarembó
DMS Co-ordinates: 30˚47'35.82"S, 54˚35'32.68"W
DD Co-ordinates: -30.793282, -54.592411
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|