Taquarembó
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Water Supply
Reservoir capacity: unknown
Height: 33 metres
Length: 330 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: 05/08 (May 2008)
Start of RCC: —/10 (— 2010)
End of RCC: —/19 (— 2019)
End of Project: —/20 (— 2020)
Country: Brazil
River: Taquarembó
DMS Co-ordinates: 30˚47'35.82"S, 54˚35'32.68"W
DD Co-ordinates: -30.793282, -54.592411
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|