SEARCHING
... please wait

Taraz

Download PDF data sheet
Photo coming soon

Particulars

Owner: Khuzestan Province Power & Water Authority

Designer: Ab Niroo Consulting Engineers

Contractor: unknown

Statistics

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

Reservoir capacity: 38 m3x106

Height: 57 metres

Length: 350 metres

Volume of RCC: unknown

Total volume: 240 m3x103

Construction Dates

Start of Project: /18 ( 2018)

Start of RCC: /22 ( 2022)

End of RCC: /29 ( 2029)

End of Project: /31 ( 2031)

Country: Iran

River: Harkesh

DMS Co-ordinates: 32˚29'39"N, 49˚6'18"E

DD Co-ordinates: 32.494167, 49.105

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type