Tianhuaban
Download PDF data sheet
Particulars
Owner: unknown
Designer: Beijing Hydropower Investigation, Design and Research Institute, CHECC
Contractor: SinoHydro Construction Bureau Nº14 Co. Ltd.
Statistics
Type: Thin Arch
Purpose(s): Hydropower
Reservoir capacity: 66 m3x106
Height: 113 metres
Length: 160 metres
Volume of RCC: 182 m3x103
Total volume: 360 m3x103
Construction Dates
Start of Project: 12/06 (December 2006)
Start of RCC: —/07 (— 2007)
End of RCC: —/09 (— 2009)
End of Project: —/10 (— 2010)
Country: China
River: Niulan
DMS Co-ordinates: 27˚1'41.12"N, 103˚17'26.67"E
DD Co-ordinates: 27.02809, 103.290741
Facings
Upstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
curve | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
ogee | RCC against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|