SEARCHING
... please wait

Ulu Sepri (formerly Batu Hampar)

Download PDF data sheet
Ulu Sepri (formerly Batu Hampar) completed
Ulu Sepri (formerly Batu Hampar) completed

Particulars

Owner: unknown

Designer: Sepakat Setia Perunding Sdn Bhd

Contractor: Dekon Sdn. Bhd. - CM Indah JV

Statistics

Type: Gravity

Purpose(s): Water Supply

Reservoir capacity: 3 m3x106

Height: 65 metres

Length: 236 metres

Volume of RCC: 200 m3x103

Total volume: 203 m3x103

Construction Dates

Start of Project: 11/07 (November 2007)

Start of RCC: 10/09 (October 2009)

End of RCC: 04/10 (April 2010)

End of Project: 05/10 (May 2010)

Country: Malaysia

River: Batu Hampar

DMS Co-ordinates: 2˚39'38.24"N, 102˚5'35.01"E

DD Co-ordinates: 2.660623, 102.093056

Facings

Upstream

SlopeType
 RCC against formwork (GEVR/GE-RCC)

Downstream

SlopeType
 RCC against precast concrete blocks

Spillway

SlopeType
 RCC against precast concrete blocks

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
65
Pozzolan (kg/m3)Pozzolan Type
120Low-lime flyash (ASTM Class F)