Particulars
Owner: unknown
Designer: Sepakat Setia Perunding Sdn Bhd
Contractor: Dekon Sdn. Bhd. - CM Indah JV
Statistics
Type: Gravity
Purpose(s): Water Supply
Reservoir capacity: 3 m3x106
Height: 65 metres
Length: 236 metres
Volume of RCC: 200 m3x103
Total volume: 203 m3x103
Construction Dates
Start of Project: 11/07 (November 2007)
Start of RCC: 10/09 (October 2009)
End of RCC: 04/10 (April 2010)
End of Project: 05/10 (May 2010)
Country: Malaysia
River: Batu Hampar
DMS Co-ordinates: 2˚39'38.24"N, 102˚5'35.01"E
DD Co-ordinates: 2.660623, 102.093056
Facings
Upstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| RCC against precast concrete blocks |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |