Val da Serra
 Download PDF data sheet
Val da Serra completed 

Particulars
Owner: unknown
Designer: ACL Assessoria e Consultoria Ltda
Contractor: IVAI- Engenharia de Obras SA
Statistics
Type: Gravity
Purpose(s): Water Supply
Reservoir capacity: 24 m3x106
Height: 37 metres
Length: 675 metres
Volume of RCC: 69 m3x103
Total volume: 95 m3x103
Construction Dates
Start of Project: 07/97 (July 1997)
Start of RCC: 11/97 (November 1997)
End of RCC: 07/98 (July 1998)
End of Project: 11/98 (November 1998)
Country: Brazil
River: Ibicui-Mirim
DMS Co-ordinates: 29˚30'23.91"S, 53˚45'4.65"W
DD Co-ordinates: -29.506641, -53.751293
Facings
Upstream
| Slope | Type | 
|---|---|
| Vertical | Reinforced concrete cast against precast units or slip-formed facing elements | 
Downstream
| Slope | Type | 
|---|---|
| Reinforced conventional concrete cast after RCC placement [stepped face] | 
Spillway
| Slope | Type | 
|---|---|
| Reinforced conventional concrete cast after RCC placement [stepped face] | 
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
| 300 | 300 | 
Cementitious material
| Cement (kg/m3) | 
|---|
| 90 | 
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|
| 30 | Low-lime flyash (ASTM Class F) | 

 
 