Xiakoutang
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: SinoHydro Construction Bureaux Nº4 and Nº5 Co. Ltd.
Statistics
Type: Thin Arch
Purpose(s): Hydropower
Reservoir capacity: unknown
Height: 70 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/17 (— 2017)
Start of RCC: —/18 (— 2018)
End of RCC: —/20 (— 2020)
End of Project: —/21 (— 2021)
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|