Xiangbiling
Download PDF data sheet
Photo coming soon

Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Thin Arch
Purpose(s): Hydropower
Reservoir capacity: 263 m3x106
Height: 142 metres
Length: 459 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/14 (— 2014)
Start of RCC: —/15 (— 2015)
End of RCC: —/16 (— 2016)
End of Project: —/17 (— 2017)
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
