Yangxishui Nº3
 Download PDF data sheet
Photo coming soon 

Particulars
Owner: unknown
Designer: Insitute of Investigation, Design and Research for Water Resources and Hydropower Projects, Guangdong Province
Contractor: Gezhouba Construction Bureau
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 2 m3x106
Height: 46 metres
Length: 202 metres
Volume of RCC: 100 m3x103
Total volume: 139 m3x103
Construction Dates
Start of Project: 11/97 (November 1997)
Start of RCC: 09/98 (September 1998)
End of RCC: 06/99 (June 1999)
End of Project: 07/00 (July 2000)
Facings
Upstream
| Slope | Type | 
|---|---|
| Vertical | Traditional concrete against formwork | 
Downstream
| Slope | Type | 
|---|---|
| Vertical | Traditional concrete against formwork | 
| 0.75 | Traditional concrete against formwork [stepped face] | 
Spillway
| Slope | Type | 
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement | 
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
| 300 | 300 | 
Cementitious material
| Cement (kg/m3) | 
|---|
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|
| Low-lime flyash (ASTM Class F) | |