SEARCHING
... please wait

Yangxishui Nº3

Download PDF data sheet
Photo coming soon

Particulars

Owner: unknown

Designer: Insitute of Investigation, Design and Research for Water Resources and Hydropower Projects, Guangdong Province

Contractor: Gezhouba Construction Bureau

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 2 m3x106

Height: 46 metres

Length: 202 metres

Volume of RCC: 100 m3x103

Total volume: 139 m3x103

Construction Dates

Start of Project: 11/97 (November 1997)

Start of RCC: 09/98 (September 1998)

End of RCC: 06/99 (June 1999)

End of Project: 07/00 (July 2000)

Country: China

River: Yangxishui

DMS Co-ordinates: unknown

DD Co-ordinates: ,

Facings

Upstream

SlopeType
VerticalTraditional concrete against formwork

Downstream

SlopeType
VerticalTraditional concrete against formwork
0.75Traditional concrete against formwork  [stepped face]

Spillway

SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)