SEARCHING
... please wait

Zhouba

Download PDF data sheet
Zhouba completed
Zhouba completed

Particulars

Owner: unknown

Designer: Institute of Investigation, Design and Research for Hydropower Projects, Chendu

Contractor: Shanxi Construction Bureau

Statistics

Type: Gravity

Purpose(s): Flood Control / Hydropower

Reservoir capacity: 204 m3x106

Height: 73 metres

Length: 163 metres

Volume of RCC: 229 m3x103

Total volume: 405 m3x103

Construction Dates

Start of Project: /04 ( 2004)

Start of RCC: /05 ( 2005)

End of RCC: /06 ( 2006)

End of Project: /07 ( 2007)

Country: China

River: Mabianhe

DMS Co-ordinates: unknown

DD Co-ordinates: ,

Facings

Upstream

SlopeType
VerticalTraditional concrete against formwork

Downstream

SlopeType
0.70Traditional concrete against formwork

Spillway

SlopeType
0.78Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
110
66
Pozzolan (kg/m3)Pozzolan Type
73Low-lime flyash (ASTM Class F)
66