Adnan Mendres (formerly Çine)
Download PDF data sheet
Particulars
Owner: unknown
Designer: Geoconsult, Gibb & Su Yapi
Contractor: Özkar Construction and Trade
Statistics
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
Reservoir capacity: 350 m3x106
Height: 137 metres
Length: 300 metres
Volume of RCC: 1560 m3x103
Total volume: 1650 m3x103
Construction Dates
Start of Project: 12/95 (December 1995)
Start of RCC: 11/04 (November 2004)
End of RCC: 04/10 (April 2010)
End of Project: 10/11 (October 2011)
Country: Turkey
River: Çine
DMS Co-ordinates: 37˚29'41.85"N, 28˚07'44.01"E
DD Co-ordinates: 37.494957, 28.128893
Facings
Upstream
Slope | Type |
---|---|
0.10 | RCC against precast concrete panels (GEVR/GE-RCC) |
0.20 |
Downstream
Slope | Type |
---|---|
0.85 | RCC against precast concrete panels (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
0.85 | RCC against precast concrete panels (GEVR/GE-RCC) |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
85 |
75 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
105 | Low-lime flyash (ASTM Class F) |
95 |