SEARCHING
... please wait

Adnan Mendres (formerly Çine)

Download PDF data sheet
Adnan Mendres (formerly Çine) completed
Adnan Mendres (formerly Çine) completed

Particulars

Owner: unknown

Designer: Geoconsult, Gibb & Su Yapi

Contractor: Özkar Construction and Trade

Statistics

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

Reservoir capacity: 350 m3x106

Height: 137 metres

Length: 300 metres

Volume of RCC: 1560 m3x103

Total volume: 1650 m3x103

Construction Dates

Start of Project: 12/95 (December 1995)

Start of RCC: 11/04 (November 2004)

End of RCC: 04/10 (April 2010)

End of Project: 10/11 (October 2011)

Country: Turkey

River: Çine

DMS Co-ordinates: 37˚29'41.85"N, 28˚07'44.01"E

DD Co-ordinates: 37.494957, 28.128893

Facings

Upstream

SlopeType
0.10RCC against precast concrete panels (GEVR/GE-RCC)
0.20 

Downstream

SlopeType
0.85RCC against precast concrete panels (GEVR/GE-RCC)

Spillway

SlopeType
0.85RCC against precast concrete panels (GEVR/GE-RCC)

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
75
Pozzolan (kg/m3)Pozzolan Type
105Low-lime flyash (ASTM Class F)
95