Barra do Coqueiros

Download PDF data sheet
Barra do Coqueiros on Google Earth
Barra do Coqueiros on Google Earth

Particulars

Owner: unknown

Designer: Engevix

Contractor: Cesbe

Statistics

Type: Gravity

Purpose(s): Hydropower / Water Supply

Reservoir capacity: 1 m3x106

Height: 60 metres

Length: 1670 metres

Volume of RCC: 172 m3x103

Total volume: 282 m3x103

Construction Dates

Start of Project: 08/07 (August 2007)

Start of RCC: /08 ( 2008)

End of RCC: /09 ( 2009)

End of Project: 07/10 (July 2010)

Country: Brazil

River: Claro

DMS Co-ordinates: 18˚43'18.20"S, 51˚00'09.95"W

DD Co-ordinates: -18.721722, -51.002766