Barra do Coqueiros
Download PDF data sheet
Particulars
Owner: unknown
Designer: Engevix
Contractor: Cesbe
Statistics
Type: Gravity
Purpose(s): Hydropower / Water Supply
Reservoir capacity: 1 m3x106
Height: 60 metres
Length: 1670 metres
Volume of RCC: 172 m3x103
Total volume: 282 m3x103
Construction Dates
Start of Project: 08/07 (August 2007)
Start of RCC: —/08 (— 2008)
End of RCC: —/09 (— 2009)
End of Project: 07/10 (July 2010)
Country: Brazil
River: Claro
DMS Co-ordinates: 18˚43'18.20"S, 51˚00'09.95"W
DD Co-ordinates: -18.721722, -51.002766
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|