Biratori
Download PDF data sheet
Particulars
Owner: unknown
Designer: Ministry of Land, Infrastructure, Transport and Tourism
Contractor: Maeda Construction Kogyo Co. Ltd & Tamehiro Connstruction Co. Ltd. JV
Statistics
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
Reservoir capacity: 46 m3x106
Height: 57 metres
Length: 600 metres
Volume of RCC: unknown
Total volume: 180 m3x103
Construction Dates
Start of Project: —/13 (— 2013)
Start of RCC: —/17 (— 2017)
End of RCC: —/22 (— 2022)
End of Project: —/24 (— 2024)
Country: Japan
River: Nukabira
DMS Co-ordinates: 42˚40'49.09"N, 142˚23'10.49"E
DD Co-ordinates: 42.680302, 142.386246
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|