SEARCHING
... please wait

Busanga

Download PDF data sheet
Photo coming soon

Particulars

Owner: unknown

Designer: unknown

Contractor: SinoHydro Co. Ltd. (**th Construction Bureau)

Statistics

Type: Thin Arch

Purpose(s): Hydropower

Reservoir capacity: unknown

Height: 142 metres

Length: unknown

Volume of RCC: 620 m3x103

Total volume: 770 m3x103

Construction Dates

Start of Project: 11/17 (November 2017)

Start of RCC: /19 ( 2019)

End of RCC: 07/21 (July 2021)

End of Project: 11/21 (November 2021)

Country: D.R. Congo

River: Lualaba

DMS Co-ordinates: 10˚7'40.36"S, 25˚24'43.32"E

DD Co-ordinates: -10.127878, 25.412033

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type