Busanga
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: SinoHydro Co. Ltd. (**th Construction Bureau)
Statistics
Type: Thin Arch
Purpose(s): Hydropower
Reservoir capacity: unknown
Height: 142 metres
Length: unknown
Volume of RCC: 620 m3x103
Total volume: 770 m3x103
Construction Dates
Start of Project: 11/17 (November 2017)
Start of RCC: —/19 (— 2019)
End of RCC: 07/21 (July 2021)
End of Project: 11/21 (November 2021)
Country: D.R. Congo
River: Lualaba
DMS Co-ordinates: 10˚7'40.36"S, 25˚24'43.32"E
DD Co-ordinates: -10.127878, 25.412033