Cana Brava
Download PDF data sheet
Particulars
Owner: unknown
Designer: Intertechne Consultores Associasdos
Contractor: Construtora Norberto Odebrecht S.A., Andrade Gutierrez J.V.
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 2300 m3x106
Height: 67 metres
Length: 510 metres
Volume of RCC: 527 m3x103
Total volume: 833 m3x103
Construction Dates
Start of Project: 03/99 (March 1999)
Start of RCC: 02/00 (February 2000)
End of RCC: 10/01 (October 2001)
End of Project: 10/02 (October 2002)
Country: Brazil
River: Tocantins
DMS Co-ordinates: 13˚24'8.06"S, 48˚8'36.64"W
DD Co-ordinates: -13.402239, -48.143513
Facings
Upstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
ogee | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
40 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
50 | Ground-granulated blast-furnace slag |