Carroll E. Ecton - formerly Winchester
Download PDF data sheet
Particulars
Owner: unknown
Designer: Parrot, Ely & Hurt & Palmer Engineering Co
Contractor: McCormick Contractors
Statistics
Type: Gravity
Purpose(s): Water Supply
Reservoir capacity: 2 m3x106
Height: 23 metres
Length: 363 metres
Volume of RCC: 24 m3x103
Total volume: 27 m3x103
Construction Dates
Start of Project: 06/84 (June 1984)
Start of RCC: 08/84 (August 1984)
End of RCC: 11/84 (November 1984)
End of Project: 01/85 (January 1985)
Country: USA
River: Upper Howard Creek
DMS Co-ordinates: 37˚56'56.53"N, 84˚13'47.49"W
DD Co-ordinates: 37.949036, -84.229858
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels |
1.00 | Unformed face of RCC |
Spillway
Slope | Type |
---|---|
1.00 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
104 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |