SEARCHING
... please wait

Carroll E. Ecton - formerly Winchester

Download PDF data sheet
Carroll E. Ecton - formerly Winchester completed
Carroll E. Ecton - formerly Winchester completed

Particulars

Owner: unknown

Designer: Parrot, Ely & Hurt & Palmer Engineering Co

Contractor: McCormick Contractors

Statistics

Type: Gravity

Purpose(s): Water Supply

Reservoir capacity: 2 m3x106

Height: 23 metres

Length: 363 metres

Volume of RCC: 24 m3x103

Total volume: 27 m3x103

Construction Dates

Start of Project: 06/84 (June 1984)

Start of RCC: 08/84 (August 1984)

End of RCC: 11/84 (November 1984)

End of Project: 01/85 (January 1985)

Country: USA

River: Upper Howard Creek

DMS Co-ordinates: 37˚56'56.53"N, 84˚13'47.49"W

DD Co-ordinates: 37.949036, -84.229858

Facings

Upstream

SlopeType
VerticalTraditional concrete against precast concrete panels with geomembrane

Downstream

SlopeType
VerticalTraditional concrete against precast concrete panels
1.00Unformed face of RCC

Spillway

SlopeType
1.00Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
104
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -