Cibeet
Download PDF data sheet
Photo coming soon

Particulars
Owner: PUPR (Public Works and Public Housing Ministry)
Designer: PT. Sarana Buana Jaya KSO, PT. Wecon, PT. Ika Adya Perkasa & PT. Bintang
Contractor: unknown
Statistics
Type: Hardfill
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
Reservoir capacity: 83 m3x106
Height: 47 metres
Length: 960 metres
Volume of RCC: 371 m3x103
Total volume: unknown
Construction Dates
Start of Project: 09/23 (September 2023)
Start of RCC: —/25 (— 2025)
End of RCC: —/27 (— 2027)
End of Project: —/28 (— 2028)
Country: Indonesia
River: Cibeet
DMS Co-ordinates: 6˚30'42.7"S, 107˚8'18.3"E
DD Co-ordinates: -6.511861, 107.13842
Facings
Upstream
| Slope | Type |
|---|---|
| 0.90 |
Downstream
| Slope | Type |
|---|---|
| 0.90 |
Spillway
| Slope | Type |
|---|---|
| 0.90 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 106 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
