SEARCHING
... please wait

El Carmen

Download PDF data sheet
Photo coming soon

Particulars

Owner: unknown

Designer: unknown

Contractor: unknown

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: unknown

Height: 75 metres

Length: unknown

Volume of RCC: unknown

Total volume: unknown

Construction Dates

Start of Project: /19 ( 2019)

Start of RCC: /21 ( 2021)

End of RCC: /23 ( 2023)

End of Project: /24 ( 2024)

Country: Nicaragua

River: Grande de Matagalpa

DMS Co-ordinates: 12˚42'15.79"N, 84˚9'5.17"W

DD Co-ordinates: 12.704387, -84.151436

Facings

Upstream

SlopeType
0.70Traditional concrete against precast concrete panels
1.00Traditional concrete against precast concrete panels

Downstream

SlopeType
0.70Traditional concrete against formwork  [stepped face]
1.00Traditional concrete against formwork  [stepped face]

Spillway

SlopeType
0.70Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type