El Carmen
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: unknown
Height: 75 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/19 (— 2019)
Start of RCC: —/21 (— 2021)
End of RCC: —/23 (— 2023)
End of Project: —/24 (— 2024)
Country: Nicaragua
River: Grande de Matagalpa
DMS Co-ordinates: 12˚42'15.79"N, 84˚9'5.17"W
DD Co-ordinates: 12.704387, -84.151436
Facings
Upstream
Slope | Type |
---|---|
0.70 | Traditional concrete against precast concrete panels |
1.00 | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork [stepped face] |
1.00 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|