SEARCHING
... please wait

Fenhe Nº2

Download PDF data sheet
Fenhe Nº2 completed
Fenhe Nº2 completed

Particulars

Owner: unknown

Designer: Shanxi Institute of Investigation and Design of Water Conservancy

Contractor: Shanxi Construction Bureau

Statistics

Type: Gravity

Purpose(s): Flood Control / Hydropower / Water Supply

Reservoir capacity: 130 m3x106

Height: 87 metres

Length: 350 metres

Volume of RCC: 362 m3x103

Total volume: 448 m3x103

Construction Dates

Start of Project: 11/96 (November 1996)

Start of RCC: 08/98 (August 1998)

End of RCC: 03/99 (March 1999)

End of Project: 06/00 (June 2000)

Country: China

River: Fenhe

DMS Co-ordinates: unknown

DD Co-ordinates: ,

Facings

Upstream

SlopeType
VerticalTraditional concrete against formwork
0.20Traditional concrete against formwork

Downstream

SlopeType
0.75Traditional concrete against precast concrete panels

Spillway

SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
127
60
Pozzolan (kg/m3)Pozzolan Type
84Low-lime flyash (ASTM Class F)
93