SEARCHING
... please wait

Funil

Download PDF data sheet
Funil completed
Funil completed

Particulars

Owner: unknown

Designer: unknown

Contractor: unknown

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 285 m3x106

Height: 50 metres

Length: unknown

Volume of RCC: unknown

Total volume: unknown

Construction Dates

Start of Project: /97 ( 1997)

Start of RCC: /99 ( 1999)

End of RCC: /01 ( 2001)

End of Project: 12/02 (December 2002)

Country: Brazil

River: Rio Grande

DMS Co-ordinates: 21˚08'32.84"S, 45˚02'10.48"W

DD Co-ordinates: -21.142456, -45.036243

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type