Funil
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 285 m3x106
Height: 50 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/97 (— 1997)
Start of RCC: —/99 (— 1999)
End of RCC: —/01 (— 2001)
End of Project: 12/02 (December 2002)
Country: Brazil
River: Rio Grande
DMS Co-ordinates: 21˚08'32.84"S, 45˚02'10.48"W
DD Co-ordinates: -21.142456, -45.036243
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|