Hongpo

Download PDF data sheet
Hongpo under construction
Hongpo under construction

Particulars

Owner: unknown

Designer: Insitute of Investigation and Design of Water Resources and Hydropower, Kunming City

Contractor: 8th Construction Bureau, MOE & MWR

Statistics

Type: Arch-Gravity

Purpose(s): Water Supply

Reservoir capacity: 3 m3x106

Height: 55 metres

Length: 244 metres

Volume of RCC: 71 m3x103

Total volume: 77 m3x103

Construction Dates

Start of Project: 10/97 (October 1997)

Start of RCC: 07/98 (July 1998)

End of RCC: 11/99 (November 1999)

End of Project: 12/99 (December 1999)

Country: China

River: Qinggoushui

DMS Co-ordinates: unknown

DD Co-ordinates: ,

Facings

Upstream

SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)

Downstream

SlopeType
0.50Traditional concrete against formwork

Spillway

SlopeType
0.50Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
54
Pozzolan (kg/m3)Pozzolan Type
99Low-lime flyash (ASTM Class F)