SEARCHING
... please wait

Kafue Gorge Lower (KGL)

Download PDF data sheet
Kafue Gorge Lower (KGL) completed
Kafue Gorge Lower (KGL) completed

Particulars

Owner: unknown

Designer: Power China/SinoHydro

Contractor: Power China/SinoHydro Co. Ltd. (11th Construction Bureau)

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 83 m3x106

Height: 131 metres

Length: 375 metres

Volume of RCC: 1290 m3x103

Total volume: 1390 m3x103

Construction Dates

Start of Project: 01/16 (January 2016)

Start of RCC: 06/18 (June 2018)

End of RCC: 04/20 (April 2020)

End of Project: /20 ( 2020)

Country: Zambia

River: Kafue

DMS Co-ordinates: 15˚52'8.6"S, 28˚31'32.05"E

DD Co-ordinates: -15.869056, 28.52557

Facings

Upstream

SlopeType
0.20RCC against formwork (GEVR/GE-RCC)

Downstream

SlopeType
0.75RCC against formwork (GEVR/GE-RCC)

Spillway

SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
112Low-lime flyash (ASTM Class F)