Lajeado (Luis Eduardo Magalhães)
Download PDF data sheet
Particulars
Owner: unknown
Designer: Themag
Contractor: Odebrecht and Andrade Gutierrez
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 4982 m3x106
Height: 43 metres
Length: 2100 metres
Volume of RCC: 188 m3x103
Total volume: 210 m3x103
Construction Dates
Start of Project: 07/98 (July 1998)
Start of RCC: 06/01 (June 2001)
End of RCC: 12/01 (December 2001)
End of Project: 12/02 (December 2002)
Country: Brazil
River: Tocantins
DMS Co-ordinates: 09˚45'28.14"S, 48˚22'18.97"W
DD Co-ordinates: -9.757817, -48.371937
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
30 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
40 | Ground-granulated blast-furnace slag |