Longmentan Nº1
Download PDF data sheet
Particulars
Owner: unknown
Designer: Fujian Institute of Investigation and Design of Water Conservancy and Hydropower
Contractor: Fujian (Minjiang) Construction Bureau
Statistics
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
Reservoir capacity: 53 m3x106
Height: 58 metres
Length: 150 metres
Volume of RCC: 71 m3x103
Total volume: 93 m3x103
Construction Dates
Start of Project: 12/85 (December 1985)
Start of RCC: 12/87 (December 1987)
End of RCC: 08/89 (August 1989)
End of Project: 09/89 (September 1989)
Country: China
River: Chanxi
DMS Co-ordinates: 25˚29'32.65"N, 118˚21'17.91"E
DD Co-ordinates: 25.492403, 118.354973
Facings
Upstream
Slope | Type |
---|---|
Vertical | Reinforced conventional concrete cast after RCC placement |
0.30 | Reinforced conventional concrete cast after RCC placement |
Downstream
Slope | Type |
---|---|
0.75 | RCC against precast concrete blocks |
Spillway
Slope | Type |
---|---|
0.75 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
72 |
54 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
82 | Low-lime flyash (ASTM Class F) |
86 |