SEARCHING
... please wait

Machado

Download PDF data sheet
Machado completed
Machado completed

Particulars

Owner: COMPESA (Companhia Pernambucana de Saneamento)

Designer: unknown

Contractor: unknown

Statistics

Type: Gravity

Purpose(s): Hydropower / Water Supply

Reservoir capacity: 15 m3x106

Height: 42 metres

Length: 360 metres

Volume of RCC: unknown

Total volume: unknown

Construction Dates

Start of Project: /89 ( 1989)

Start of RCC: /90 ( 1990)

End of RCC: /91 ( 1991)

End of Project: /92 ( 1992)

Country: Brazil

River: Riacho do Chorão

DMS Co-ordinates: 7˚59'58.57"S, 36˚16'11.76"W

DD Co-ordinates: -7.999603, -36.269932

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type