Peixe Angical
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 3 m3x106
Height: 39 metres
Length: 400 metres
Volume of RCC: 500 m3x103
Total volume: 582 m3x103
Construction Dates
Start of Project: 04/02 (April 2002)
Start of RCC: —/04 (— 2004)
End of RCC: —/05 (— 2005)
End of Project: 09/06 (September 2006)
Country: Brazil
River: Tocantins
DMS Co-ordinates: 12˚14'7.67"S, 48˚23'10.16"W
DD Co-ordinates: -12.235494, -48.386101
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
70 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |