SEARCHING
... please wait

Rompepicos en Corral des Palmas

Download PDF data sheet
Rompepicos en Corral des Palmas completed
Rompepicos en Corral des Palmas completed

Particulars

Owner: unknown

Designer: Instituto de Ingeniera de la Universidad Autonoma de Nuevo Leon

Contractor: DYCUSA

Statistics

Type: Gravity

Purpose(s): Flood Control

Reservoir capacity: 100 m3x106

Height: 109 metres

Length: 250 metres

Volume of RCC: 380 m3x103

Total volume: 400 m3x103

Construction Dates

Start of Project: /02 ( 2002)

Start of RCC: 03/03 (March 2003)

End of RCC: /03 ( 2003)

End of Project: /04 ( 2004)

Country: Mexico

River: Santa Catarina

DMS Co-ordinates: 25˚33'23.63"N, 100˚23'52.56"W

DD Co-ordinates: 25.556564, -100.397934

Facings

Upstream

SlopeType
VerticalRCC against precast concrete panels with geomembrane

Downstream

SlopeType
VerticalTraditional concrete against precast concrete panels
0.85Unformed face of RCC

Spillway

SlopeType
0.85Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
65
Pozzolan (kg/m3)Pozzolan Type
35Low-lime flyash (ASTM Class F)