Saizhu
Download PDF data sheet
Particulars
Owner: unknown
Designer: Hydrochina Guiyang Engineering Corporation
Contractor: SinoHydro Construction Bureau Nº14 Co. Ltd.
Statistics
Type: Thin Arch
Purpose(s): Hydropower
Reservoir capacity: 3 m3x106
Height: 72 metres
Length: 160 metres
Volume of RCC: 107 m3x103
Total volume: 115 m3x103
Construction Dates
Start of Project: 04/06 (April 2006)
Start of RCC: —/09 (— 2009)
End of RCC: —/10 (— 2010)
End of Project: —/11 (— 2011)
Country: China
River: Xima
DMS Co-ordinates: 25˚57'10.14"N, 102˚46'53.44"E
DD Co-ordinates: 25.952818, 102.781509