SEARCHING
... please wait

Saizhu

Download PDF data sheet
Saizhu completed
Saizhu completed

Particulars

Owner: unknown

Designer: Hydrochina Guiyang Engineering Corporation

Contractor: SinoHydro Construction Bureau Nº14 Co. Ltd.

Statistics

Type: Thin Arch

Purpose(s): Hydropower

Reservoir capacity: 3 m3x106

Height: 72 metres

Length: 160 metres

Volume of RCC: 107 m3x103

Total volume: 115 m3x103

Construction Dates

Start of Project: 04/06 (April 2006)

Start of RCC: /09 ( 2009)

End of RCC: /10 ( 2010)

End of Project: /11 ( 2011)

Country: China

River: Xima

DMS Co-ordinates: 25˚57'10.14"N, 102˚46'53.44"E

DD Co-ordinates: 25.952818, 102.781509

Facings

Upstream

SlopeType
curveRCC against formwork (GEVR/GE-RCC)

Downstream

SlopeType
curveRCC against formwork (GEVR/GE-RCC)

Spillway

SlopeType
 RCC against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type