Salto Y-Y
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: unknown
Height: 20 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/18 (— 2018)
Start of RCC: —/19 (— 2019)
End of RCC: —/20 (— 2020)
End of Project: —/21 (— 2021)
Country: Nicaragua
River: Bambana
DMS Co-ordinates: 13˚53'3.72"N, 84˚29'31.13"W
DD Co-ordinates: 13.884368, -84.491982
Facings
Upstream
Slope | Type |
---|---|
0.70 | Traditional concrete against precast concrete panels |
1.00 | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork [stepped face] |
1.00 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|