SEARCHING
... please wait

Salto Y-Y

Download PDF data sheet
Photo coming soon

Particulars

Owner: unknown

Designer: unknown

Contractor: unknown

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: unknown

Height: 20 metres

Length: unknown

Volume of RCC: unknown

Total volume: unknown

Construction Dates

Start of Project: /18 ( 2018)

Start of RCC: /19 ( 2019)

End of RCC: /20 ( 2020)

End of Project: /21 ( 2021)

Country: Nicaragua

River: Bambana

DMS Co-ordinates: 13˚53'3.72"N, 84˚29'31.13"W

DD Co-ordinates: 13.884368, -84.491982

Facings

Upstream

SlopeType
0.70Traditional concrete against precast concrete panels
1.00Traditional concrete against precast concrete panels

Downstream

SlopeType
0.70Traditional concrete against formwork  [stepped face]
1.00Traditional concrete against formwork  [stepped face]

Spillway

SlopeType
0.70Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type