Salto Y-Y
 Download PDF data sheet
Photo coming soon 

Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: unknown
Height: 20 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/18 (— 2018)
Start of RCC: —/19 (— 2019)
End of RCC: —/20 (— 2020)
End of Project: —/21 (— 2021)
Country: Nicaragua
River: Bambana
DMS Co-ordinates: 13˚53'3.72"N, 84˚29'31.13"W
DD Co-ordinates: 13.884368, -84.491982
Facings
Upstream
| Slope | Type | 
|---|---|
| 0.70 | Traditional concrete against precast concrete panels | 
| 1.00 | Traditional concrete against precast concrete panels | 
Downstream
| Slope | Type | 
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] | 
| 1.00 | Traditional concrete against formwork [stepped face] | 
Spillway
| Slope | Type | 
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] | 
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
Cementitious material
| Cement (kg/m3) | 
|---|
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|
