SEARCHING
... please wait

Shannipo

< Back to search results

Download PDF data sheet
Shannipo completed
Shannipo completed

Particulars

Owner: Guizhou Qianyuan Power Co. Ltd.

Designer: Guiyang Hydropower Investigation, Design and Research Institute, CHECC

Contractor: unknown

Statistics

Type: Thin Arch

Purpose(s): Hydropower

Reservoir capacity: 85 m3x106

Height: 119 metres

Length: 205 metres

Volume of RCC: 199 m3x103

Total volume: 267 m3x103

Construction Dates

Start of Project: —/09 (— 2009)

Start of RCC: —/11 (— 2011)

End of RCC: —/13 (— 2013)

End of Project: —/15 (— 2015)

Country: China

River: Beipan

DMS Co-ordinates: 26˚14'12.82"N, 104˚49'26.4"E

DD Co-ordinates: 26.236895, 104.823997

Facings

Upstream

SlopeType
curveRCC against formwork (GEVR/GE-RCC)

Downstream

SlopeType
curveRCC against formwork

Spillway

SlopeType
ogeeRCC against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type