SEARCHING
... please wait

Shimenzi

Download PDF data sheet
Shimenzi completed
Shimenzi completed

Particulars

Owner: unknown

Designer: Department of Hydropower, Qinghua University

Contractor: Gezhouba Construction Bureau

Statistics

Type: Thin Arch

Purpose(s): Hydropower / Irrigation / Water Supply

Reservoir capacity: 80 m3x106

Height: 110 metres

Length: 176 metres

Volume of RCC: 188 m3x103

Total volume: 211 m3x103

Construction Dates

Start of Project: 06/98 (June 1998)

Start of RCC: 06/99 (June 1999)

End of RCC: 06/01 (June 2001)

End of Project: 10/01 (October 2001)

Country: China

River: Taxi

DMS Co-ordinates: unknown

DD Co-ordinates: ,

Facings

Upstream

SlopeType
0.142RCC against formwork (GEVR/GE-RCC)
VerticalRCC against formwork (GEVR/GE-RCC)

Downstream

SlopeType
VerticalRCC against formwork
0.18RCC against formwork

Spillway

SlopeType
crestReinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
93
62
Pozzolan (kg/m3)Pozzolan Type
110Low-lime flyash (ASTM Class F)
110