Shuidong
Download PDF data sheet
Shuidong completed

Particulars
Owner: unknown
Designer: Fujian Institute of Investigation and Design of Water Conservancy and Electric Power
Contractor: Fujian (Minjiang) Construction Bureau
Statistics
Type: Gravity
Purpose(s): Hydropower / Navigation
Reservoir capacity: 108 m3x106
Height: 63 metres
Length: 197 metres
Volume of RCC: 126 m3x103
Total volume: 184 m3x103
Construction Dates
Start of Project: 04/91 (April 1991)
Start of RCC: 11/92 (November 1992)
End of RCC: 10/93 (October 1993)
End of Project: 12/95 (December 1995)
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 90 | Low-lime flyash (ASTM Class F) |
