Taolinkou
Download PDF data sheet
Particulars
Owner: unknown
Designer: Institute of Investigation and Design of Water Conservancy and Hydroelectric Power in Tianjin
Contractor: Hydropower Command (China An’neng Construction Corporation) and Hebei Construction Bureau
Statistics
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Recreation / Water Supply
Reservoir capacity: 859 m3x106
Height: 75 metres
Length: 500 metres
Volume of RCC: 585 m3x103
Total volume: 1350 m3x103
Construction Dates
Start of Project: 11/92 (November 1992)
Start of RCC: 12/94 (December 1994)
End of RCC: 12/97 (December 1997)
End of Project: —/98 (— 1998)
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.15 |
Downstream
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
ogee | Traditional concrete against formwork |
0.65 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
135 |
70 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
70 | Low-lime flyash (ASTM Class F) |
85 |