Teles Pires completed
Teles Pires completed

Particulars

Owner: unknown

Designer: Intertechne Consultores Associasdos

Contractor: unknown

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 1 m3x106

Height: 67 metres

Length: 360 metres

Volume of RCC: 500 m3x103

Total volume: 1020 m3x103

Construction Dates

Start of Project: 07/11 (July 2011)

Start of RCC: /13 ( 2013)

End of RCC: /15 ( 2015)

End of Project: 09/16 (September 2016)

Country: Brazil

River: Teles Pires

DMS Co-ordinates: 09˚21'56.46"S, 56˚46'40.84"W

DD Co-ordinates: -9.365683, -56.778011

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type