Teles Pires
Download PDF data sheet
Teles Pires completed

Particulars
Owner: unknown
Designer: Intertechne Consultores Associasdos
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 1 m3x106
Height: 67 metres
Length: 360 metres
Volume of RCC: 500 m3x103
Total volume: 1020 m3x103
Construction Dates
Start of Project: 07/11 (July 2011)
Start of RCC: —/13 (— 2013)
End of RCC: —/15 (— 2015)
End of Project: 09/16 (September 2016)
Country: Brazil
River: Teles Pires
DMS Co-ordinates: 09˚21'56.46"S, 56˚46'40.84"W
DD Co-ordinates: -9.365683, -56.778011
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
