Tucuruí - 2nd Phase
Download PDF data sheet
Particulars
Owner: unknown
Designer: Themag-Engevix
Contractor: Comargo Correa Comércio e Constro
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 45800 m3x106
Height: 78 metres
Length: 1541 metres
Volume of RCC: 288 m3x103
Total volume: 1383 m3x103
Construction Dates
Start of Project: 06/98 (June 1998)
Start of RCC: 06/99 (June 1999)
End of RCC: 09/00 (September 2000)
End of Project: 10/05 (October 2005)
Country: Brazil
River: Tocantins
DMS Co-ordinates: 3˚49'53.70"S, 49˚38'37.66"W
DD Co-ordinates: -3.831583, -49.643795
Facings
Upstream
Slope | Type |
---|---|
RCC against formwork |
Downstream
Slope | Type |
---|---|
RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
separate |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
70 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
30 | Natural pozzolan (ASTM Class N) |